6CNC Electronics
SMT Assembly Services
Align placement data, soldering, and inspection.
Surface-mount PCB assembly with component procurement and board fabrication available in the same project. Define the component packages, board sides, orientation, and inspection requirements before production.
Your build brief
Define the Next Build
- Gerber, BOM, and placement/CPL data
- Assembly drawing and polarity notes
- Fine-pitch/BGA package details
- Quantity and inspection or test requirements
Engineering focus
Make the Manufacturing Scope Clear
01
Placement Definition
Provide the reference designator, coordinate, side, and rotation for each fitted component. Resolve orientation ambiguity with the assembly drawing and package information.
02
Package & Board Review
Identify fine-pitch and BGA components, local access restrictions, and any special handling notes. Review package-specific inspection requirements with the design package.
03
Verification Plan
Inspect component position, polarity, and solder joints. Specify hidden-joint inspection and functional tests according to the assembly requirements.
Project decisions
What to Define Before Release
| Requirement | What to Define |
|---|---|
| Input consistency | BOM, placement file, and board data from the same revision. |
| Component scope | Surface-mount packages and board-side requirements. |
| Inspection scope | Visible solder features, hidden joints, and specified functions. |
Quotation files
Prepare a Reviewable Project Package
- Gerber, BOM, and placement/CPL data
- Assembly drawing and polarity notes
- Fine-pitch/BGA package details
- Quantity and inspection or test requirements
Project questions
SMT Assembly Services FAQ
Can SMT and through-hole parts be assembled together?
Yes. A mixed-technology build coordinates both processes and the relevant assembly sequence.
What minimum component size should I design around?
Send the intended packages for review. This page does not introduce an unverified package-size or pitch limit.
Start your next build
Share Your Manufacturing Requirements
Send the available files, quantity, and project requirements. Include the details that still need engineering review.
