6CNC Electronics

Multilayer PCB Manufacturing

Plan the stackup before releasing the multilayer board.

Manufacture multilayer circuit boards with layer construction, interconnections, and electrical requirements reviewed together. Give the fabrication team a defined stackup instead of relying on layer count alone.

Your build brief

Define the Next Build

  • Gerber layers, drill files, and layer naming
  • Stackup drawing or proposed construction
  • Material and copper requirements
  • Impedance notes, quantity, and delivery target

Engineering focus

Make the Manufacturing Scope Clear

01

Layer Construction

Describe the layer order, intended copper distribution, dielectric requirements, and finished thickness. Distinguish mandatory material requirements from a stackup proposal that can be reviewed.

02

Interconnection Definition

Identify through, blind, or buried connections and the layers they join. Advanced via constructions need to be reviewed with the proposed fabrication sequence.

03

Electrical & Mechanical Coordination

Provide impedance targets where needed and identify the signal layers involved. Confirm the finished thickness and critical openings against connectors, card guides, and enclosure mounting.

Project decisions

What to Define Before Release

RequirementWhat to Define
Stackup statusApproved construction or a proposed construction for review.
Signal requirementsCritical layers, reference relationships, and any impedance targets.
Build constraintsCopper, finished thickness, via construction, and mechanical envelope.

Quotation files

Prepare a Reviewable Project Package

  • Gerber layers, drill files, and layer naming
  • Stackup drawing or proposed construction
  • Material and copper requirements
  • Impedance notes, quantity, and delivery target

Project questions

Multilayer PCB Manufacturing FAQ

Does layer count define the whole manufacturing specification?

No. Two boards with the same layer count can have different materials, copper, via structures, and inspection requirements.

Can the prototype stackup be reused for production?

Record the construction approved during evaluation and review it for the production quantity. Do not assume an undocumented prototype stackup is the production specification.

Start your next build

Share Your Manufacturing Requirements

Send the available files, quantity, and project requirements. Include the details that still need engineering review.